Funding for contractors who are tired of waiting to get paid. Fund the Job Before the Draw.
Cover payroll between draws, buy the truck, or take the bigger job. Advances, lines of credit and term loans for contractors and trades.
Talk to Matt: +1 (201) 862-4048Applying won’t affect your credit score. Accepting an offer may involve a hard inquiry.
You Did the Work. The Money Is Still Weeks Away.
The pay application is in. The crew is paid Friday.
Read the full picture
Every contractor knows the shape of it. The job is framed. The pay application is in. The crew still needs to be paid on Friday. Slow and uneven payments cost US construction an estimated $299 billion in 2025. That works out to a hidden 14 percent tax on the whole industry, according to Rabbet’s 2025 Construction Payments Report. The same report found that 91 percent of general contractors now weigh an owner’s payment reputation before they bid. And 88 percent walked away from at least one project last year because the pay was too slow.
Subs carry most of it. Subcontractors wait an average of 56 days to be paid after they submit a pay application. While they wait, 86 percent front the labor and 75 percent pay for materials out of their own pocket. Those figures come from Billd’s surveys as compiled by DocJoist. One in three subs has pulled from personal or retirement savings to make payroll. Forty-three percent say they do not have the working capital to absorb one surprise expense.
The same compilation shows how wide the problem runs. Dodge Construction Network found 74 percent of construction companies reporting moderate to severe cash flow problems. Mobilization Funding found 56 percent of contractors had turned down a project because of cash flow risk. Electrical, plumbing and HVAC contractors do better at 57 days, per CreditPulse. Better, and still eight weeks of money you have earned and cannot spend.
Here is what those weeks cost a working contractor:
- A crew that is not paid on Friday may not be there on Monday. Rehiring and retraining costs more than any bridge.
- A supplier who is paid late stops extending terms. Then every order needs cash up front.
- A job you cannot mobilize is a job someone else takes. The bid you won turns into the bid you lost.
- Personal savings spent on payroll are savings that do not come back when the draw finally lands.
Here is what Batch does about it. Money against the work you have already booked, on a schedule that fits how contractors actually get paid. Read about how we fund businesses, or keep going for the numbers.
The Six Reasons Contractors Call.
The money is not earmarked. These are the six things it usually goes to.
Payroll between draws
Mobilization on a new job
Materials deposits
Trucks, vans and equipment
Hiring a crew for a bigger contract
Slow season cash
Five Ways to Fund the Job, Side by Side.
Terms as of 2026-09-28. Compare offers on Estimated APR and total payback, not the factor alone.
| Amount | How you pay it back | Typical time to funds | Best for | |
|---|---|---|---|---|
| Merchant cash advance | $5,000 to $2,000,000 | Fixed daily or weekly remittance. Factor 1.25 to 1.50. | As fast as same day | Payroll between draws, mobilization, a materials deposit due this week |
| Business line of credit | Set per file | Draw as needed. Interest only on what is out. | As fast as 1 to 3 days | The slow season, a customer who pays in 60 days, the next slipped draw |
| Term loan | Set per file | Fixed monthly payments over a set term. | As fast as 3 to 7 days | A planned investment with steady deposits behind it |
| SBA loan | 7(a) up to $5,000,000; 504 up to $5,500,000 | 7(a): monthly up to 10 years, or 25 for real estate, at SBA-capped rates. 504: 10, 20 or 25 years at a fixed rate. | Longer than an advance | Expansion and real estate; buying a business (7(a)) |
| Equipment financing | Set by the vendor quote | Monthly payments, secured by the equipment. | As fast as 2 to 5 days | Trucks, vans, machines and tools, new or used |
Two Contractors, Two Kinds of Money.
Computed the same way the desk prices an offer. Estimates, not offers.
The Sub With Payroll Due Friday.
A $60,000 pay application is 45 days out. $18,000 of payroll is due Friday. A $20,000 advance at a factor of 1.375, the middle of our range, remitted daily over 60 calendar days.
- Estimated advance
- $20,000
- Estimated payback amount
- $27,500
- Estimated cost of capital
- $7,500
- Estimated daily remittance
- $639.53 for 43 business days
- Estimated APR
- 401% (actuarial); simple annualized 227%
The HVAC Company Adding a Van.
A second service van before summer. Assume a $50,000 van (your dealer quote sets the real number), 10% down, 12% APR over 60 months.
- Amount financed
- $45,000
- Estimated monthly payment
- $1,001.00
- Estimated total interest
- $15,060
- Estimated total paid
- $65,060
What each example shows
The sub with payroll due Friday. The alternative is missing payroll. A crew that is not paid Friday may not be there Monday. Rehiring and retraining costs more than $7,500. The draw covers the payback with room to spare.
The HVAC company adding a van. The van is the collateral. The rate is set by the equipment, the term and the file rather than by a personal asset. A second van that books three more calls a day pays its own note.
Estimates only. Your offer depends on the review of your statements.
Three Things a Contractor's File Is Read For.
A funder does not read a business plan. It reads the bank statements and the contract. Here is what it looks for, in the order it looks.
Do you meet the basics?
- 3+ months in business (6 typical)
- $10,000+ a month in deposits into the business account
- Credit of 500+, checked with a soft pull
Floors as of 2026-09-28. Meeting them does not guarantee an offer. Missing one does not always rule you out.
Consistency of monthly deposits
Funders read the deposits into your business account, month by month. Steady deposits matter more than profit on paper.
Existing advances or positions
An advance that is already remitting from the account changes what a funder will offer. Tell us up front. It is the first thing they see in the statements anyway.
Contracts in hand or a schedule of values
A signed contract, a pay application or a schedule of values shows the money that is already booked. It is the strongest thing a contractor can attach.
One more thing that helps: the story behind the statements. A big deposit in March and nothing in April reads badly on its own. It reads fine once the funder knows March was a retainage release and April was the start of a new job. Put two lines in the application that explain the swings. Matt passes them along with the file, and the offer is better for it.
What a Sub Should Expect to Have Tied Up.
Batch Capital is based in New Jersey and funds contractors in both states and nationwide. Matt takes every call himself. A contractor who knows the difference between a draw and a retainage release is speaking with someone who does too.
New Jersey: the Prompt Payment Act
New York: retainage capped at 5 percent
Written for the Trade, Not the Industry.
Each trade gets paid on its own rhythm. The funding should match it.
HVAC
Plumbing and electrical
Roofing
Landscaping
General contractors
Specialty trades
See Where You Stand in a Minute.
A few taps, no statements and no hard credit pull. Matt calls you back with real numbers.
How much are you looking for?
Funded in Four Steps.
Apply in 5 to 10 minutes
A short application on this site. No hard credit pull to apply. You can do it from the truck.
Send three months of statements
Business bank statements, a voided check and a government ID. For larger amounts, add the contract or schedule of values.
Compare offers, true cost side by side
Compare offers on Estimated APR and total payback, not the factor alone, whatever the product.
Get funded
Accept the offer that fits. The funds land in the business account, and payroll goes out on time.
How the four products work
A merchant cash advance
A business line of credit
A term loan, and equipment financing
About Estimated APR
Commonly Asked Questions
How fast can a New Jersey contractor get working capital, and what does it cost?
Can I get funded while I'm waiting on a draw or a slow paying GC?
What is pay when paid, and how do I cover payroll under it?
Can a new contractor qualify?
Can I qualify with bad credit?
What documents do I need?
How fast can I get funded?
Book the Job. We'll Help You Fund It.
5 to 10 minutes to apply, no hard credit pull, and a person in New Jersey who picks up.
